Pimpalpada–Savale PSP

Study terms approved (ToR) (as of 29 June 2026) · Chambery Power (EDF Power Solutions India)

2,100MW

Not disclosedtrees to be felled

99.36ha of forest land

  1. MoU signed
  2. Study terms (ToR)
  3. Forest clearance
  4. Construction
  5. Operating
Forest (ha) 99.36 Documented“be around 249.23 ha, involving 99.36 ha of forest land and 149.87 ha of non-forest land.”EAC 57th meeting minutes, 29 Jun 2026 (Pimpalpada Savale ToR, item 57.6), page500 · 29 June 2026
Total land (ha) 249.23 Documented“Storage Project (2100 MW) in an area of 249.23 ha, located in Karjat and Mawal Sub-”EAC 57th meeting minutes, 29 Jun 2026 (Pimpalpada Savale ToR, item 57.6), page209 · 29 June 2026
Capacity (MW) 2,100 Reported“…The Government of Maharashtra has signed an MoU with Chambery Power, a group company of EDF Power Solutions India, to develop the 2,100 MW Pimpalpada–Savale pumped storage project in Pune District and Raigad District, with an estimated investment of INR 10,217 cror…”Maharashtra signs ₹10,217 cr MoU with Chambery Power · 5 March 2026
Cost (₹ crore) 10,217 Reported“…p the 2,100 MW Pimpalpada–Savale pumped storage project in Pune District and Raigad District, with an estimated investment of INR 10,217 crore. March 05, 2026. By Mrinmoy Dey The Government of Maharashtra has signed a memorandum of understanding (MoU) with Chambe…”Maharashtra signs ₹10,217 cr MoU with Chambery Power · 5 March 2026
Location18.9579°N, 73.4697°E (exact)Documented“Latitude 18°57'28.56" N”EAC 57th meeting minutes, 29 Jun 2026 (Pimpalpada Savale ToR, item 57.6), page199 · 29 June 2026
DistrictPune, Raigad, Karjat, Mawal
MoU signed5 March 2026

Notes

  • Closed loop A PSP whose two reservoirs are built away from rivers; water is filled once and then recirculated. More in glossary → , 2,100 MW on 249.23 ha in Karjat (Raigad) and Mawal (Pune): the same ridge as Torrent's Saidongar projects.
  • Taken up for a fresh Terms of Reference (ToR) The list of studies an EIA must cover, set by the expert committee. Getting a ToR is the first clearance step, not a permission to build. More in glossary → at the Expert Appraisal Committee (EAC) The central committee of experts that recommends ToR and EC for river valley and hydro projects, including PSPs. More in glossary → 57th meeting (29 Jun 2026, item 57.6, proposal IA/MH/RIV/582404/2026); the minutes and the forest area are not yet read.
  • EAC 57th minutes (item 57.6): ToR recommended. 249.23 ha = 99.36 ha forest + 149.87 ha non-forest; lower reservoir 109.53 ha of which 59.81 ha forest.
  • One alternative layout fell partly inside Bhimashankar Wildlife sanctuary (WLS) and tiger reserve Protected areas under the Wild Life (Protection) Act. A tiger reserve has an inviolate core and a surrounding buffer. More in glossary → and was dropped.
  • All components are in the draft Western Ghats Ecologically Sensitive Area (ESA) About 56,825 sq km of the Western Ghats proposed for protection since 2014; still only a draft, reissued six times. More in glossary → .

Timeline

Category
  1. · Clearance Documented #

    EAC recommends ToR for Pimpalpada Savale: 99.36 ha forest

    Details and documents

    Chambery Power's 2,100 MWDocumented“Pimpalpada Savale Close Loop Pumped Storage Project (2100 MW) in an area of 249.23”EAC 57th meeting minutes, 29 Jun 2026 (item 57.6), page499 · 29 June 2026 closed loop in Karjat and Mawal needs 249.23 haDocumented“Storage Project (2100 MW) in an area of 249.23 ha, located in Karjat and Mawal Sub-”EAC 57th meeting minutes, 29 Jun 2026 (item 57.6), page209 · 29 June 2026, of which 99.36 haDocumented“be around 249.23 ha, involving 99.36 ha of forest land and 149.87 ha of non-forest land.”EAC 57th meeting minutes, 29 Jun 2026 (item 57.6), page500 · 29 June 2026 is forest. An alternative layout that cut into Bhimashankar WLS was dropped.

    Pimpalpada–Savale PSP · EAC 57th meeting minutes, 29 Jun 2026 (item 57.6)

  2. · Policy Official claim #

    CM orders time-bound rollout of 55 Pumped storage project (PSP) Two reservoirs at different heights: water is pumped up when power is cheap and released through turbines when power is needed. More in glossary → Memorandum of understanding (MoU) A non-binding agreement between the state and a developer to study and build a project at a site, with a water allocation. More in glossary → (78,215 MW)

    Details and documents

    Maharashtra's tally reached 55Official claim“Maharashtra Pumped Storage Power Projects: 55 MoUs Fast-Tracked”Electrical Mirror MoUs, 78,215 MWOfficial claim“…eting, Maharashtra has signed 55 MoUs with various companies to develop pumped storage projects with a total proposed capacity of 78,215 MW. The projects are expected to attract an investment of around ₹4,16,701 crore and generate nearly 1,27,990 employment opportun…”Electrical Mirror and ₹4.17 lakh crore; six projects (10,300 MWOfficial claim“…16,701 crore and generate nearly 1,27,990 employment opportunities. Fadnavis noted that six projects with a combined capacity of 10,300 MW have already received approval for their Detailed Project Reports (DPRs) from the Central Electricity Authority, and work on t…”Electrical Mirror) had CEA concurrence Technical-economic approval of a hydro DPR by the Central Electricity Authority, needed above a cost threshold. More in glossary → Detailed project report (DPR) The engineering and cost report for a project; a pre-feasibility report (PFR) is the early version. More in glossary → concurrence.